• Latest
  • Trending
power

Rs 6.67 lakh cr needed by 2031-32 to expand thermal power capacity

July 26, 2024
heart attack

Study shows kidney drug can boost treatment for heart attack patients

September 2, 2024
Swaminathan

RBI’s stringent actions intended to protect customers: Swaminathan

September 2, 2024
Dhanush, Shourya and Vania

Dhanush, Shourya and Vania trio break world record in Air Rifle at Deaf World Championships

September 2, 2024
Indian equity indices opened flat on August 29 due to negative cues from Asian and US markets

Sensex closes above 82,500 points for first time ever

September 2, 2024
coal

India’s coal production sees 6.48 pc growth at 384 MT in April-August

September 2, 2024
railways

Cabinet nod to Rs 18,036 cr project to connect Mumbai, Indore via shortest rail route

September 2, 2024
telecom manufacturing

Aim to democratise telecom services under Digital Bharat Nidhi initiative

September 2, 2024
ace ev

Indian commercial vehicle industry reverses decline, to see modest growth in FY25

September 2, 2024
India’s manufacturing growth

India’s manufacturing growth eases in August, stays above long-run average

September 2, 2024
Supreme Court

SC dismisses PIL seeking caste-based census

September 2, 2024

Indian Navy’s P-8I lands in France, marking its first ever deployment in Europe

September 2, 2024
PM Modi congratulates Nishad Kumar

PM Modi congratulates Nishad Kumar on winning silver medal in Paralympics

September 2, 2024
Blitz India UK Edition
Contact
Download
  • Home
  • Booming Britain
  • G20 Podium
  • Legal
  • Specials
  • National
    • East
    • West
    • South
    • North
  • News
  • Education
  • Videos
  • Contact
No Result
View All Result
Welcome To Blitz India Media
No Result
View All Result

Rs 6.67 lakh cr needed by 2031-32 to expand thermal power capacity

by Blitzindiamedia
July 26, 2024
in News
0
power
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

YOU MAY ALSO LIKE

Study shows kidney drug can boost treatment for heart attack patients

RBI’s stringent actions intended to protect customers: Swaminathan

Blitz Bureau

NEW DELHI: The Power Ministry has estimated that the expansion required in the country’s thermal capacity to meet the growing demand for electricity will entail an expenditure of a minimum of Rs 6.67 lakh crore by 2031-32, Minister of State for Power Shripad Naik informed the Parliament.
In order to meet the estimated electricity demand by the year 2031-32, generation planning studies have been carried out by the Central Electricity Authority (CEA), he told the Lok Sabha in a written reply.
As per the study results, it is envisaged that to meet the base load requirement of the country in 2032, the required coal and lignite-based installed capacity would be 283 GW against the present installed capacity of 217.5 GW.
“Considering this, the Centre proposes to set up an additional minimum 80 GW coal-based capacity by 2031-32,” Naik said. The estimated capital cost for setting up new coal-based thermal capacity as considered in the National Electricity Plan is Rs 8.34 crore per MW (1,000 MW=1GW). The cost has been worked out at the 2021-22 price level.
To reduce the dependence on coal-based thermal power plants, the Government has planned to augment non-fossil fuel-based installed electricity generation capacity.

Blitzindiamedia News Subscription

Search

No Result
View All Result
Welcome To Blitz India Media

© 2023 Blitz India Media -Blitz India Building A New Nation

Navigate Site

  • Booming Britain
  • G20 Podium
  • New India
  • Legal
  • Contact

Follow Us

No Result
View All Result
  • Home
  • News
  • The Blitz
  • G20 Podium
  • National
    • East
    • West
    • South
    • North
  • Focus
  • Opinion
  • Booming Britain
  • Perspective
  • Legal
  • Specials
  • Download

© 2023 Blitz India Media -Blitz India Building A New Nation