• Latest
  • Trending
Mahan Energen

BHEL receives Rs 11,000 cr order from Adani Power’s subsidiary Mahan Energen

August 26, 2024
heart attack

Study shows kidney drug can boost treatment for heart attack patients

September 2, 2024
Swaminathan

RBI’s stringent actions intended to protect customers: Swaminathan

September 2, 2024
Dhanush, Shourya and Vania

Dhanush, Shourya and Vania trio break world record in Air Rifle at Deaf World Championships

September 2, 2024
Indian equity indices opened flat on August 29 due to negative cues from Asian and US markets

Sensex closes above 82,500 points for first time ever

September 2, 2024
coal

India’s coal production sees 6.48 pc growth at 384 MT in April-August

September 2, 2024
railways

Cabinet nod to Rs 18,036 cr project to connect Mumbai, Indore via shortest rail route

September 2, 2024
telecom manufacturing

Aim to democratise telecom services under Digital Bharat Nidhi initiative

September 2, 2024
ace ev

Indian commercial vehicle industry reverses decline, to see modest growth in FY25

September 2, 2024
India’s manufacturing growth

India’s manufacturing growth eases in August, stays above long-run average

September 2, 2024
Supreme Court

SC dismisses PIL seeking caste-based census

September 2, 2024

Indian Navy’s P-8I lands in France, marking its first ever deployment in Europe

September 2, 2024
PM Modi congratulates Nishad Kumar

PM Modi congratulates Nishad Kumar on winning silver medal in Paralympics

September 2, 2024
Blitz India UK Edition
Contact
Download
  • Home
  • Booming Britain
  • G20 Podium
  • Legal
  • Specials
  • National
    • East
    • West
    • South
    • North
  • News
  • Education
  • Videos
  • Contact
No Result
View All Result
Welcome To Blitz India Media
No Result
View All Result

BHEL receives Rs 11,000 cr order from Adani Power’s subsidiary Mahan Energen

by Blitzindiamedia
August 26, 2024
in News
0
Mahan Energen
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

NEW DELHI: State-run Bharat Heavy Electricals Ltd (BHEL) on August 25 said it has received a Rs 11,000 crore order from Adani Power and its subsidiary Mahan Energen Ltd (MEL) to set up three supercritical thermal power projects.

Each of the three projects will be of 2×800 MW rating in Kawai, Rajasthan and in Madhya Pradesh’s Mahan. In a stock exchange filing, BHEL said it needs to complete the Kawai Phase-II project in 49 months, the Kawai Phase-III project in 52 months and the Mahan Phase-III project in 55 months.

YOU MAY ALSO LIKE

Study shows kidney drug can boost treatment for heart attack patients

RBI’s stringent actions intended to protect customers: Swaminathan

In the filing, BHEL said it will be involved in the supply of equipment and supervision of erection and commissioning for the three power projects mentioned above. The supply of equipment includes boilers, turbines, generators, and associated auxiliaries, as well as control and instrumentation.

“Bharat Heavy Electricals Limited (BHEL) has signed a contract agreement with Adani Power Ltd and its subsidiary (Mahan Energen Ltd) for setting up three Supercritical Thermal Power projects (each of 2×800 MW rating) in Kawai, Rajasthan and Mahan, Madhya Pradesh,” said the state-run company.

For the April-June quarter (Q1 FY25), BHEL reported a 9.6 per cent growth in its revenue to Rs 5,484 crore (year-on-year).

Meanwhile, Adani Power reported that consolidated continuing profit before tax (PBT) grew 95 per cent to Rs 4,483 crore in the April-June quarter against Rs 2,303 crore in the same period last year due to higher reported EBITDA and lower finance cost.

The consolidated power sale volume stood at 24.1 billion units (BU) in Q1 FY25, up by 38 per cent from 17.5 billion units in Q1 FY24 due to improved power demand and larger effective operating capacity.

The growth comes at a time when the power demand is continuing to exhibit strong growth across India, with aggregate power demand in the first quarter growing at 10.6 per cent year-on-year and peak demand growing at 12 per cent to reach a record level of 250 GW. According to Adani Power, it has an installed thermal power capacity of 15,210 MW spread across eight power plants in Gujarat, Maharashtra, Karnataka, Rajasthan, Chhattisgarh, Madhya Pradesh, and Jharkhand, apart from a 40 MW solar power plant in Gujarat.

Blitzindiamedia News Subscription

Search

No Result
View All Result
Welcome To Blitz India Media

© 2023 Blitz India Media -Blitz India Building A New Nation

Navigate Site

  • Booming Britain
  • G20 Podium
  • New India
  • Legal
  • Contact

Follow Us

No Result
View All Result
  • Home
  • News
  • The Blitz
  • G20 Podium
  • National
    • East
    • West
    • South
    • North
  • Focus
  • Opinion
  • Booming Britain
  • Perspective
  • Legal
  • Specials
  • Download

© 2023 Blitz India Media -Blitz India Building A New Nation