• Latest
  • Trending
coal-based plants

Govt lines up Rs 6.67 lakh cr plan to set up 80 GW coal-based power capacity

July 31, 2024
heart attack

Study shows kidney drug can boost treatment for heart attack patients

September 2, 2024
Swaminathan

RBI’s stringent actions intended to protect customers: Swaminathan

September 2, 2024
Dhanush, Shourya and Vania

Dhanush, Shourya and Vania trio break world record in Air Rifle at Deaf World Championships

September 2, 2024
Indian equity indices opened flat on August 29 due to negative cues from Asian and US markets

Sensex closes above 82,500 points for first time ever

September 2, 2024
coal

India’s coal production sees 6.48 pc growth at 384 MT in April-August

September 2, 2024
railways

Cabinet nod to Rs 18,036 cr project to connect Mumbai, Indore via shortest rail route

September 2, 2024
telecom manufacturing

Aim to democratise telecom services under Digital Bharat Nidhi initiative

September 2, 2024
ace ev

Indian commercial vehicle industry reverses decline, to see modest growth in FY25

September 2, 2024
India’s manufacturing growth

India’s manufacturing growth eases in August, stays above long-run average

September 2, 2024
Supreme Court

SC dismisses PIL seeking caste-based census

September 2, 2024

Indian Navy’s P-8I lands in France, marking its first ever deployment in Europe

September 2, 2024
PM Modi congratulates Nishad Kumar

PM Modi congratulates Nishad Kumar on winning silver medal in Paralympics

September 2, 2024
Blitz India UK Edition
Contact
Download
  • Home
  • Booming Britain
  • G20 Podium
  • Legal
  • Specials
  • National
    • East
    • West
    • South
    • North
  • News
  • Education
  • Videos
  • Contact
No Result
View All Result
Welcome To Blitz India Media
No Result
View All Result

Govt lines up Rs 6.67 lakh cr plan to set up 80 GW coal-based power capacity

by Blitzindiamedia
July 31, 2024
in News
0
coal-based plants
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter
Blitz Bureau

NEW DELHI: The Government is planning to set up an additional 80 GW coal-based power capacity with an investment of Rs 6.67 lakh crore by 2031-32 to meet the growing demand for electricity in the country.

The target has been fixed following a study carried out by the Central Electricity Authority (CEA). As per the study results, it is envisaged that to meet the base load requirement of the country in 2032, the required coal & lignite based installed capacity would be 283 GW against the present installed capacity of 217.5 GW, according to information provided by Minister of State for Power Shripad Naik to the Rajya Sabha.

YOU MAY ALSO LIKE

Study shows kidney drug can boost treatment for heart attack patients

RBI’s stringent actions intended to protect customers: Swaminathan

The estimated capital cost for setting up new coal-based thermal capacity as considered in the National Electricity Plan is Rs 8.34 crore/MW (at 2021-22 price level). Hence, the thermal capacity addition is expected to entail an expenditure of a minimum Rs 6,67,200 crore by 2031-32. Naik also said that to reduce the dependency on coal-based thermal power plants, the Government has planned to augment non-fossil fuel-based installed electricity generation capacity. India in its Intended Nationally Determined Contributions (INDCs) stands committed to achieving about 50 per cent cumulative electric power.

Blitzindiamedia News Subscription

Search

No Result
View All Result
Welcome To Blitz India Media

© 2023 Blitz India Media -Blitz India Building A New Nation

Navigate Site

  • Booming Britain
  • G20 Podium
  • New India
  • Legal
  • Contact

Follow Us

No Result
View All Result
  • Home
  • News
  • The Blitz
  • G20 Podium
  • National
    • East
    • West
    • South
    • North
  • Focus
  • Opinion
  • Booming Britain
  • Perspective
  • Legal
  • Specials
  • Download

© 2023 Blitz India Media -Blitz India Building A New Nation